Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the insert-headers-and-footers domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the limit-login-attempts-reloaded domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Cambria Park

Mon - Fri: 9:00 - 4:00

Office hours

|+1 604 499 4466

Call Us

Previous slide
Next slide

Extreme Powerwash Ltd. provided construction cleaning services and general labors for Cambria Park for Mosaic Homes.

Cambria Park is a new condo development by Mosaic Homes at 515 West 54th Avenue, Vancouver. The development was completed in 2018. Cambria Park has a total of 69 units. Grand city homes framed by parks on two sides, experienced through high-volume spaces and private outdoor living areas. Architectural design by Ramsay Worden Architects Ltd. Interior design by Insight Design Group.

Project Summary

Client

Mosaic Homes

Scope of Work

Construction cleaning services and General Labor

Year Complete

2018