Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the insert-headers-and-footers domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the limit-login-attempts-reloaded domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Parq Resort & Casino

Mon - Fri: 9:00 - 4:00

Office hours

|+1 604 499 4466

Call Us

Previous slide
Next slide

Parq Resort & Casino

Extreme Powerwash Ltd. provided pre-construction and final construction services for Parq Vancouver (formerly Parq Urban Resort and Casino)  for Ellis Don Construction Svc Inc. Positioned on a challenging and previously unused site adjacent to BC Place, the U-shaped building contains two Marriott hotels with a combined 518 rooms, one with luxury suites.

An international entertainment destination, the facility includes a 72,000-sq-ft casino, eight restaurants, bars and lounges; and Canada’s largest hotel ballroom. On the rooftop of the casino complex’s six-storey podium, a large 30,000-sq-ft treed rooftop park features over 200 native pines. The design concept pays tribute to BC’s natural beauty, and is designed to meet LEED Gold standards.

Project Summary

Client

Ellis Don Construction Svc Inc.

Scope of Work

Pre and final construction cleaning

Year Complete

2017